Bridge Building- A Bridge Too Far!©
Overview
This OD simulation is ideal for organizations wanting to address a ‘Silo-ed’ structure.
Simulation Objective:
Each of the team needs to build a bridge, which connect with the bridges of every other team.
The task is completed only when each member of every team crosses over on all the interconnected bridges.
Each bridge needs to be at a minimum of 5 feet in height above the ground. All bridges need to be inter-connected and users should be able to switch from one to the next without needing to step-off on the ground.
Great for:
- ‘Hands-on’ team experience
- Use of resources ‘ people and equipment
- Facilitative Leadership
- Teamwork and Synergy
- Big picture perspective
- Fun!
Venue:
Any hotel/resort with lots of trees
Duration:
3 hours.
Group Size:
20-60
Testimonial
"Our experience with 'Xperentia' was truly amazing.
The objective of the workshop was Cross Functional Synergy, Achievement Orientation and
integrating our Brand Values.
All this was achieved effectively.
At the end of the program, participants felt a great sense of achievement, ready to take on
any new challenge that may now come across their way.
Personally... I am still to recover from the awesome experience of swimming in The Ganga.
A Very professionally managed workshop."
CEO (M & G),Vodafone Currently MD for Vodafone shared services –India (VSSI)
“Enable individuals to utilize their full potential and lead a fulfilling and productive Life.”
Other Pages
Contact Info
- Xperentia Consulting 1303/A, New Link Rd, Andheri West, Mumbai, Maharashtra 400053.
- +91 9820092775
- anamika@xperentia.com
Copyright © 2025. All rights reserved.